Logistics Park Glassworks

Logistics Park Glassworks

Transformation

Transformation

Logistic Park Glasswork is an inspiring transformation of a historic glass factory into a sustainable and future-proof development.

Logistic Park Glasswork is an inspiring transformation of a historic glass factory into a sustainable and future-proof development.

The AGC glass factory in Tiel, “Maasglas,” was established in 1963. Initially, it produced window glass and employed about 1,000 workers. In 1981, the factory was acquired by Asahi Glass Company (AGC). AGC produced safety glass for offices and the auto industry. In 2009, the tempered glass plant closed. The float glass plant closed in 2012 due to overcapacity. The final closure of all operations took place in 2015.

The AGC glass factory in Tiel, “Maasglas,” was established in 1963. Initially, it produced window glass and employed about 1,000 workers. In 1981, the factory was acquired by Asahi Glass Company (AGC). AGC produced safety glass for offices and the auto industry. In 2009, the tempered glass plant closed. The float glass plant closed in 2012 due to overcapacity. The final closure of all operations took place in 2015.

Why Logistic Park Glassworks?

Why Logistic Park Glassworks?

Building permits have been granted.
No nitrogen emissions issues, the nature permit had been granted.

Building permits have been granted.
No nitrogen emissions issues, the nature permit had been granted.

Building permits have been granted.
No nitrogen emissions issues, the nature permit had been granted.

BREEAM Excellent.
A benchmark for sustainable and future-proof real estate.
  

BREEAM Excellent.
A benchmark for sustainable and future-proof real estate.
  

BREEAM Excellent.
A benchmark for sustainable and future-proof real estate.
  

Grid power connection of 15 Megawatts. Power generation of approximately 15 Megawatts of green energy.

Grid power connection of 15 Megawatts. Power generation of approximately 15 Megawatts of green energy.

Grid power connection of 15 Megawatts. Power generation of approximately 15 Megawatts of green energy.

Location and accessibility

Location and accessibility

A unique location, in the heart
of the Netherlands

A unique location, in the heart
of the Netherlands

Adapted for ships

Tiel has its own inland shipping terminal (CTU Rivierenland) on the AmsterdamRijnkanaal. This container terminal, managed by CTU, part of Theo Pouw Group, has a 200-metre loading and unloading quay, a port crane and a reeferstack for temperature-controlled containers. The terminal offers frequent barge connections to various destinations, including the ports of Rotterdam and Amsterdam.

Adapted for ships

Tiel has its own inland shipping terminal (CTU Rivierenland) on the AmsterdamRijnkanaal. This container terminal, managed by CTU, part of Theo Pouw Group, has a 200-metre loading and unloading quay, a port crane and a reeferstack for temperature-controlled containers. The terminal offers frequent barge connections to various destinations, including the ports of Rotterdam and Amsterdam.

Adapted for ships

Tiel has its own inland shipping terminal (CTU Rivierenland) on the AmsterdamRijnkanaal. This container terminal, managed by CTU, part of Theo Pouw Group, has a 200-metre loading and unloading quay, a port crane and a reeferstack for temperature-controlled containers. The terminal offers frequent barge connections to various destinations, including the ports of Rotterdam and Amsterdam.

Easily accessible by car

Tiel is located southeast of Utrecht, directly on the A15 motorway. The “Kellen” business park has excellent access by car and is optimally connected to the A15 motorway. Deil interchange and the A2 motorway are only about 10 minutes' drive away.

Easily accessible by car

Tiel is located southeast of Utrecht, directly on the A15 motorway. The “Kellen” business park has excellent access by car and is optimally connected to the A15 motorway. Deil interchange and the A2 motorway are only about 10 minutes' drive away.

Easily accessible by car

Tiel is located southeast of Utrecht, directly on the A15 motorway. The “Kellen” business park has excellent access by car and is optimally connected to the A15 motorway. Deil interchange and the A2 motorway are only about 10 minutes' drive away.

The level of delivery

Warehouse

Office

  • BREEAM Excellent

  • Free height: 15.20m and free stack height: 14.90m

  • Column structure: 22.60m x 11.30m

  • Installation of solar panels on the roof

  • Floor load capacity: 55 kN/m²

  • Floor: Nen 2747 class 1, flat floors

  • Mechanical dock levelers, 2,000mm x 2,800mm, electro-hydraulically operated. Static capacity 100 kN, dynamic capacity 60 kN.

  • LED lighting

The level of delivery

Warehouse

Office

  • BREEAM Excellent

  • Free height: 15.20m and free stack height: 14.90m

  • Column structure: 22.60m x 11.30m

  • Installation of solar panels on the roof

  • Floor load capacity: 55 kN/m²

  • Floor: Nen 2747 class 1, flat floors

  • Mechanical dock levelers, 2,000mm x 2,800mm, electro-hydraulically operated. Static capacity 100 kN, dynamic capacity 60 kN.

  • LED lighting

The level of delivery

Warehouse

Office

  • BREEAM Excellent

  • Free height: 15.20m and free stack height: 14.90m

  • Column structure: 22.60m x 11.30m

  • Installation of solar panels on the roof

  • Floor load capacity: 55 kN/m²

  • Floor: Nen 2747 class 1, flat floors

  • Mechanical dock levelers, 2,000mm x 2,800mm, electro-hydraulically operated. Static capacity 100 kN, dynamic capacity 60 kN.

  • LED lighting

Montea is currently constructing a building of approximately 94,000 for Intergamma.

Montea is currently constructing a building of approximately 94,000 for Intergamma.

Montea is currently constructing a building of approximately 94,000 for Intergamma.

Availability

Availability

Two new developments are available

Two new developments are available

DC Quartz

Warehouse: 60,258 sq m

Warehouse: 60,258 sq m

Warehouse: 60,258 sq m

Office: 1,611 sq m

Office: 1,611 sq m

Office: 1,611 sq m

Mezzanine: 5,612 sq m

Mezzanine: 5,612 sq m

Mezzanine: 5,612 sq m

Parking spaces: 299

Parking spaces: 299

Parking spaces: 299

Parking spaces truck: 9

Parking spaces truck: 9

Parking spaces truck: 9

Possible partial rental is possible!

Possible partial rental is possible!

DC Silica

Warehouse: 20,716 sq m

Warehouse: 20,716 sq m

Warehouse: 20,716 sq m

Office: 884 sq m

Office: 884 sq m

Office: 884 sq m

Mezzanine: 2,381 sq m

Mezzanine: 2,381 sq m

Mezzanine: 2,381 sq m

Parking spaces: 139

Parking spaces: 139

Parking spaces: 139

Other availability

Other availability

Panovenweg 12

Warehouse: 8,498 sq m

Warehouse: 8,498 sq m

Warehouse: 8,498 sq m

Office: 516 sq m

Office: 516 sq m

Office: 516 sq m

Mezzanine: 731 sq m

Mezzanine: 731 sq m

Mezzanine: 731 sq m

Parking spaces: 25

Parking spaces: 25

Parking spaces: 25

Outside terrain: 16,770 sq m

Outside terrain: 16,770 sq m

Outside terrain: 16,770 sq m

Loading docks: 6

Loading docks: 6

Loading docks: 6

Sustainability

Sustainability

A sustainable site

A sustainable site

  • Charging facilities

    Charging stations (22kW) for electric vehicles will be provided. Also the bicycle storage will have the necessary facilities for electric bicycles.

  • Rainwater

    Rainwater is collected with the ambition to reuse it in the future.

  • Energy monitoring

    The warehouse features an energy monitoring system that allows customers and Montea to track daily energy usage and make necessary adjustments, quickly identifying and correcting any deviations.

  • Ventilation

    In order not to work with a gas-fired air heaterand a separate installation responsible for the hygiene ventilation air, we switch to air handling units in combination with heat pumps placed on the roof.

  • Materials

    Montea reassess its choice of materials continuously and will look for innovative and circular materials that can be easily repaired, dismantled, reused or recycled without any major impact on the environment.

  • Lighting

    LED lighting will be used which works with presence detection.

  • Biodiversity

    A flower meadow around the building will promote biodiversity and gives an enjoyable work environment.

Contact us for more information!

Or write your message here, so we can contact you!

Or write your message here, so we can contact you!